Vancouver Headquarters
HQSuite 200
Vancouver, WA 98660 (360) 555-0142
Service area / OR
Bridge rehabilitation and seismic work on rural and Gorge crossings, water systems in Central Oregon, and wastewater programs in the Willamette Valley.
Overview
Oregon is where our work is most varied. From the Columbia River Gorge to high-desert pipelines and the Willamette Valley's wastewater programs, we serve county public works departments, special water districts, sanitary districts and the state DOT under on-call and open-bid contracts.
Recent projects include the North Fork Bridge seismic retrofit, the Cedar Ridge reservoir and transmission main in Bend and the Basin 7 Lift Station Program, now under construction in Salem. The state's seismic-resilience priorities and its water-quality compliance obligations make our experience in both disciplines valuable.
Oregon projects are managed from the Bend regional office for Central and Eastern Oregon and from Vancouver for the Gorge and Willamette Valley. We hold an active Construction Contractors Board license and are prequalified with the state DOT for structures and roadway work.
Offices
Projects
01 / Water / Bend, OR
$25M–$100M · CM/GC · 2020
02 / Transportation / Hood River, OR
$5M–$25M · Design-Bid-Build · 2018
03 / Wastewater / Salem, OR
$25M–$100M · CM/GC · In progress
04 / Wastewater / Eugene, OR
$25M–$100M · Progressive Design-Build · 2021
Try asking
Prefer a person?
AI assistant. It can make mistakes, so please confirm details with our team.