Wastewater

Three Rivers Biosolids Facility

*Two 1.6 million-gallon post-tensioned anaerobic digesters with combined heat and power, thermal dryers and a Class A biosolids product, built on an operating treatment plant campus.

Three Rivers Biosolids Facility
Client
Three Rivers Sanitary District
Engineer
Willamette Basin Engineers
Location
Eugene, OR
Value
$25M–$100M
Delivery
Progressive Design-Build
Status
Completed
Completed
2021

Spec sheet

By the numbers

Digesters
Two 1.6 MG, post-tensioned concrete
Digester height
62 ft sidewall, 78 ft dia.
Biogas engines
Two 1.1 MW CHP units
Dryer capacity
8 dry tons per day
Concrete placed
9,700 CY
Contract value
$58.9 million (GMP)

Story

Challenge, solution and outcome

Challenge

The district was sending 32,000 wet tons of biosolids per year to land application at rising cost, and had to meet a state mandate to produce a Class A product. The new facility had to tie into the existing plant sludge lines and gas system without upsetting the existing digesters.

Post-tensioning, digester gas handling and dryer equipment all carry long lead times and specialist installation requirements.

Solution

We contracted the post-tensioning specialist and the dryer manufacturer during design, then scheduled the work around their fabrication calendars. Digester walls were formed with a climbing system and stressed in three stages, with maturity sensors determining the stressing date.

The gas system was built under a hot-work permit program with continuous LEL monitoring, and every gas pipe was pressure-tested and pneumatically proved before purging. The district's operators were trained on a simulator that we set up two months before start-up.

Outcome

The facility produced its first Class A product 38 days ahead of the baseline schedule. The CHP units now cover about 62 percent of the plant's electrical load, and annual biosolids hauling fell by 71 percent.

The project closed with 0 lost-time incidents over 262,000 hours, and the digesters passed their water-tightness test with zero measurable loss.

Safety

Safety highlights

  • 0 lost-time incidents over 262,000 work hours
  • Digester gas hot-work permit program with continuous LEL monitoring
  • Post-tensioning exclusion zones and stressing-operation checklists
  • Climbing-form fall protection engineered for 62-foot walls

From the owner

“The digesters were the first thing in our history to hold water on the first test. The operations team still talks about how well the commissioning was run.”

Patricia Nygaard Plant Superintendent, Three Rivers Sanitary District

Gallery

Three Rivers Biosolids Facility — image 1
Three Rivers Biosolids Facility — image 2