01 / Transportation / Shelton, WA
Skookum Creek Bridge Replacement
$5M–$25M · Design-Bid-Build · 2023
Transportation / Water / Wastewater / Municipal & Federal
*Mass excavation, grading, soil improvement, stormwater and erosion control for plant sites, corridors and levees.
Overview
Every project starts with earthwork. We own a fleet of excavators, dozers, scrapers, articulated trucks and compactors, outfitted with GPS machine control, and we move more than 2 million cubic yards of material each year. Our estimators know which sites are going to be wet, which will be rock and which will require special handling of contaminated or unsuitable soils.
We perform mass grading for treatment plant sites and highway corridors, construct embankments and levees to engineered specifications, and install stone columns, wick drains, preloads and surcharges where soils require improvement. Compaction is verified by our QC technicians using nuclear density gauges and, where specified, intelligent compaction and proof rolling.
Working in the Pacific Northwest means working in the rain. We implement erosion and sediment control plans with temporary and permanent BMPs, manage dewatering and turbidity compliance and keep a certified erosion and sediment control lead (CESCL) on every site. Stormwater ponds, bioswales, outfalls and permanent water-quality facilities are built as part of the site package.
We also handle site utilities, retaining walls, rock excavation, demolition and clearing. For the owner, one contractor means one point of accountability from the first clearing pass to final stabilization.
Questions
Projects
01 / Transportation / Shelton, WA
$5M–$25M · Design-Bid-Build · 2023
02 / Water / Bend, OR
$25M–$100M · CM/GC · 2020
03 / Municipal & Federal / Anacortes, WA
$25M–$100M · CM at Risk · 2024
Try asking
Prefer a person?
AI assistant. It can make mistakes, so please confirm details with our team.