01 / Transportation / Camas, WA
Route 14 Interchange Reconstruction
$25M–$100M · CM/GC · 2022
Transportation / Water / Wastewater
*Design-build, progressive design-build and CM/GC delivery with early cost certainty, constructability input and a single point of responsibility.
Overview
Public owners increasingly choose alternative delivery methods to reduce risk and compress schedules. Halvorsen Pike has delivered projects under design-build, progressive design-build, CM/GC and CM/AR contracts for DOTs, cities, water districts and sanitary authorities. We are a member of the Design-Build Institute of America (DBIA), and several of our project managers are DBIA-certified.
We assign a pre-construction lead, estimator, scheduler and superintendent during design. Together they review constructability, develop cost models at each design milestone, price alternatives and identify long-lead procurements. By the time the guaranteed maximum price is established, the owner has seen the scope, the assumptions and the contingency in detail.
We work with established engineering firms across the Northwest and structure each team to match the owner's priorities. Risk is allocated openly: owners get a clear view of what is in the price, what is in the contingency and how savings are shared.
For progressive design-build, we maintain open-book pricing, subcontractor selection through transparent competition and DBE participation plans that reflect the owner's goals.
Questions
Projects
01 / Transportation / Camas, WA
$25M–$100M · CM/GC · 2022
02 / Water / Battle Ground, WA
$25M–$100M · Progressive Design-Build · 2023
03 / Wastewater / Port Orchard, WA
$100M–$250M · Progressive Design-Build · In progress