City of Port Alder

Open

Skagit Haul Corridor: Trucking and Materials Hauling

Anacortes, WA

Bids due
Nov 25, 20262:00 PM
Funding source
Local

Scopes

Subcontract packages

Dump truck hauling
Truck and side-dump hauling for about 38,000 CY of excavation.
Aggregate and rock delivery
About 14,000 tons of base course and quarry spalls, delivered to staged stockpiles.
Erosion control and stabilization
Silt fence, inlet protection, mulching and wet-season stabilization per the TESC plan.
Hydroseeding and landscaping
Hydroseed, plantings and one-year plant establishment.
Topographic and construction survey
Control, construction staking and as-built survey for the street and storm work.

Notes

Bid details

Multiple small subcontracts for the Port Alder stormwater and street improvement package: dump truck and side-dump hauling (est. 38,000 CY of excavation and 14,000 tons of aggregate), temporary and permanent erosion control, hydroseeding and landscape restoration, and construction survey staking.

Quotes may be submitted for any individual scope. Halvorsen Pike encourages bids from local and small businesses, and we will unbundle the work to match your capacity where we can.