Cascadia Regional DOT

Open

Route 14 Westbound Ramp Widening: Electrical and Instrumentation

Camas, WA

Bids due
Nov 10, 20262:00 PM
Pre-bid meeting
Nov 2, 20261:00 PM
Funding source
Federal
DBE goal
14%

Scopes

Subcontract packages

Roadway illumination
22 poles with foundations, luminaires and wiring to the new service cabinet.
ITS conduit and fiber
About 7,400 LF of conduit, pull boxes and single-mode fiber with splicing and testing.
Signal modifications
Ramp-terminal signal modification, detection and controller cabinet changes.
Electrical service and metering
New 120/240V service cabinet, metering and utility coordination.

Notes

Bid details

Electrical subcontract for a westbound on-ramp widening with new roadway lighting on 22 poles, 7,400 feet of ITS conduit with fiber optic cable, a signal modification at the ramp terminal and a new 120/240V service cabinet. Work is performed under the state DOT's standard specifications and requires a state-licensed electrical contractor with current prevailing wage compliance.

This federal-aid project carries a 14 percent DBE goal. Bidders must submit DBE participation commitments and documentation of good-faith efforts. Buy America requirements apply to all steel and iron products, including poles and conduit.