01 / Transportation / Camas, WA
Route 14 Interchange Reconstruction
$25M–$100M · CM/GC · 2022
Transportation
*Interchanges, widenings, reconstruction and paving, built under live traffic with staged closures and tight smoothness tolerances.
Overview
Our highway division builds and reconstructs freeways, arterials and interchanges throughout the region. We handle the full roadway scope: clearing, mass excavation, drainage, retaining walls, subgrade, aggregate base, asphalt and concrete paving, signing, striping, illumination and ITS conduit. Because we own our trucks, paving trains and grading equipment, we control production and cost on the largest line items.
Most of our highway projects keep traffic moving. We develop staged traffic control plans with the owner, perform nighttime and weekend closures when required, and use movable barrier, crash cushions and queue-warning systems to keep both workers and the public safe. Our traffic control supervisors are ATSSA-certified and our project managers have lane-rental experience on high-volume corridors.
We place more than 150,000 tons of hot mix asphalt in a typical season, using material transfer vehicles and intelligent compaction to achieve consistent density. Concrete paving, ramp reconstruction and mechanically stabilized earth (MSE) walls are performed by crews that have worked together for more than a decade. Retaining walls, noise walls and drainage structures are built in-house to keep interfaces clean.
Quality control is performed by our own certified technicians, with test results posted to the owner within 24 hours.
Questions
Projects
01 / Transportation / Camas, WA
$25M–$100M · CM/GC · 2022
02 / Transportation, Municipal & Federal / Chehalis, WA
$5M–$25M · Design-Bid-Build · 2023